Concrete Floor Stripping & Removal in Calexico CA - a clean slab ready for the next floor
Old epoxy peeling, flaking or lifting in patches? We find out whether it needs a spot repair or full removal, then leave clean concrete.
Request an estimate
What does it take to get an old coating off a concrete floor?
Concrete floor stripping and removal in Calexico means taking a failed coating such as epoxy off the slab, down to the concrete underneath, then cleaning up and prepping that concrete so the next floor has something solid to bond to.
If your garage coating is peeling where the tires sit, flaking at the edges or lifting in sheets, the bond to the concrete has let go, and a new garage floor coating laid over it would fail right along with it. The price mostly follows how big the floor is, how many coats are on it, how hard they're still holding and how much the bare slab needs once it's uncovered. The schedule turns on those same things, plus how soon you can clear the space out. The written estimate I give you after looking at the floor puts your own figure on it.
How we handle concrete floor stripping and removal
I start by checking how well the old coating is still holding, because if most of it is bonded, a spot repair may be all you need, and I'll tell you that plainly. When it all has to come off, we take it down to bare concrete and match the method to the floor, so a home garage gets different equipment than a warehouse slab or a loading dock, where shot blasting usually makes more sense because speed per square foot matters more than hauling the machine in. One materials maker's guide warns that harsher methods like flame blasting, scarifying and scabbling can leave tiny cracks in the concrete, and since that concrete is what your next floor grips, the method is worth talking through before anything starts. Once the coating is off, we clean up and leave the slab ready for whatever goes down next.
Stripping is usually the first half of the job. Most homeowners follow it with new epoxy floor coatings, and shops, warehouses and business floors usually move on to commercial and industrial epoxy floor coatings built for heavier traffic.
What to know about concrete floor stripping and removal in Calexico
In Calexico, the city's building department reviews plans, sends out field inspectors and coordinates permit approvals with outside agencies, including the county air pollution control district. I won't tell you a stripping job never needs a permit, because that's the city's call to make for a given job. If yours needs one, I'll tell you at the estimate, and we'll handle the paperwork with the city or county office that covers your address and book the inspections.
Most of the stripping calls we get here are garages where an older coating has let go under hot tires and shop floors worn through in the traffic lanes, and we see the same on jobs in Heber and El Centro. We're based in Calexico and work in the cities around it, so if yours isn't on the site, call and ask.
- Call (442) 250-4457
- Mon–Sun: 7 AM–10 PM
- Calexico, CA 92231
What happens when you call Calexico Precision Epoxy Flooring in Calexico?
Call or send a message
Call (442) 250-4457 or use the form, and we'll set a time for me to come see the floor. A few photos of the worst spots help me know what I'm walking into.
I look the floor over
I check the slab for moisture and cracks, see how well the coating is holding and go over your options with you. You get a written estimate that spells out what comes off, how we'll take it off and what it costs, so there's nothing left to guess.
We strip it to concrete
Our crew does the work with me on site the whole time. Plan on the space being cleared out and off limits until we're done.
Walk the bare slab together
Once we've cleaned up, we walk the floor with you so you can see the concrete for yourself. We'll point out anything the slab needs before the next floor goes down.
Why Calexico homeowners call Calexico Precision Epoxy Flooring for floor stripping
The owner stays on site
I'm the one who looks at your floor and gives the estimate, and I'm on site with our crew while the coating comes off. That way nothing gets lost between what we talked about in your garage and what actually happens on the slab.
Licensed and fully insured
California's contractor licensing board says a license is required even on jobs under $1,000 when the work needs a permit of any kind or the contractor hires workers to help. We're licensed and fully insured, so you don't have to wonder whether your job crosses that line.
Prep is what we're known for
I learned concrete prep working on other crews before starting this business in 2023, and we're best known for floors that stay bonded because the time goes into the concrete underneath. A stripping job is all prep, so it's the work I care about most.
If you're not sure whether your floor needs a repair or a full strip, that's what the visit is for. Request your estimate or call (442) 250-4457.
Request an estimateGet a written estimate for stripping your floor
We'll get back to you within one business day to set a time, and I'll come out for a free on-site estimate with no obligation. I'll look at the slab, talk through what you want from the floor next and leave you a written estimate.
- Licensed and fully insured.
- Phone
- (442) 250-4457
- Location
- Calexico, CA 92231
- Hours
- Mon–Sun: 7 AM–10 PM
Questions about floor stripping in Calexico
Do I need full epoxy removal or just a repair on my floor?
If most of the floor is still bonded and solid, you likely need a repair, not a full removal. One coatings seller's guide puts the line at about 90 percent of the floor bonded, and says full removal is the right call when the bond has failed everywhere.
What is the best way to remove epoxy from a garage floor?
For most home garages, diamond grinding is the usual choice, a walk-behind grinder with diamond tooling that cuts the coating away a layer at a time. One coatings guide calls it almost always the practical choice for a standard two- or three-car garage, while chemical strippers, which soften the bond so the film can be scraped off, work best on thin single-coat floors and small spots.
How long does it take to strip an epoxy floor?
A typical 1,000-square-foot area might take one to three days, according to one flooring cost guide, and that includes cleanup and prep for the new floor. Plan on the garage or room being out of use for that stretch, and I'll go over what to expect for your floor at the estimate.
How much does concrete floor stripping cost in Calexico?
Your cost comes in a written estimate after I've seen the slab, because two floors the same size can take very different work. A thin single coat comes off faster than several thick layers that are still gripping hard, and a spot repair costs less than stripping the whole floor.
How do I keep silica dust down when grinding concrete?
Water sprays and vacuums with HEPA filters, which trap very fine particles, both reduce the dust from grinding concrete. It matters because diamond grinding makes a lot of silica dust, a serious breathing hazard, so ask any crew which of these they use before grinding starts.
Who do I call about permits for floor work in Calexico?
The city's building department takes questions at (760) 768-2105 or building@calexico.ca.gov. If we're doing your job and it turns out to need a permit, we take care of that side, so you don't have to make the call yourself.
Floors we put down after stripping
Epoxy Floor Coatings
Once the old coating is off, a fresh epoxy floor bonds straight to clean concrete, which is the whole point of stripping it down first.
Commercial & Industrial Epoxy Floor Coatings
Shops, warehouses and business floors take heavier traffic than a home garage, so the coating that replaces a failed one needs to be built for that load.
See if your old coating has to go
Call (442) 250-4457 or send the form with your floor size, the coating that's on it and whether it's failing in one spot or everywhere, so I can come out ready.
Request an estimateCall (442) 250-4457